AeroHub Project Update 007
Work is continuing to install the roof structure over the manufacturing space. The office shell is
nearly complete and waterproof. Framing has begun for the break room. Steel has begun to be
installed for the cranes systems in the center bay.
To share information with everyone, as well as to document the construction process, I will be
making periodic project update videos. These videos will be uploaded to Youtube and links will be
shared when each new video is posted. This week’s video can be found here:
https://youtu.be/AeULsRlen4A or by scanning the QR code below.